Time Audit tool

See where AI might help with routine work.

Choose common tasks to get a planning estimate of the time they may take. The figures use generic assumptions, not measurements from your business.

The interactive calculator could not start.

You can still get help with a manual estimate. Email [email protected] with the tasks you want to review and your estimated hourly cost.

$ / hour
Default is $25/hr — a neutral placeholder for a fully-loaded support wage. Your hourly cost and selected estimates are sent only with a review request.
0 HRS / WEEK (EST.)
$0 COST EQUIVALENT / MO (EST.)
0 / 10
SELECTED

Estimates use each selected task's generic weekly-hours midpoint, assume that time repeats each week, and do not measure your team's actual work. Monthly labor-cost equivalent assumes four weeks and the hourly cost you enter; it is not a promise of cash savings and excludes setup or operating costs.

STEP 1

Which tasks may be taking your team’s time?

Select task types to see an illustrative estimate and a ready-to-use prompt. The displayed range is a generic planning assumption, not a measured baseline.

HOURS / MONTH (EST.)

Assumes the generic selected-task midpoint repeats for four weeks; no time study was performed.

LABOR COST EQUIVALENT / MONTH (EST.)

Estimated hours × your entered hourly cost × four weeks. Assumes all estimated time could be redirected; excludes setup and operating costs.

LABOR COST EQUIVALENT / YEAR (EST.)

Assumes the monthly estimate and hourly cost stay unchanged for 12 months.

A planning view of where time may be redirected.

90-MINUTE TIME EQUIVALENTS / WEEK (EST.)

Assumes 90 minutes per equivalent; this is not a forecast of additional meetings.

💸

MONTHLY LABOR COST EQUIVALENT (EST.)

Estimated hours × entered hourly cost × four weeks; excludes implementation costs.

🙌

20-HOUR WORKWEEK EQUIVALENTS (EST.)

Assumes one equivalent represents 20 hours each week; this does not imply a hire is funded.

✨

8-HOUR WORKDAY EQUIVALENTS / YEAR (EST.)

Assumes this weekly estimate repeats for 52 weeks and one workday is eight hours.

Your custom time breakdown

Want to review the assumptions?

A call can help you compare these planning estimates with your actual workflow and costs.

Compare these estimates with your workflow
30 min Custom AI plan Zero pressure

Leads side first? Run the free 30-Minute Lead-Response Audit — 30 pass/needs-work checks across capture, speed to lead, follow-up, booking and tracking.

Want a person to review your estimates?

Your estimates and selected task names are included in a review request. The request asks for a transactional acknowledgement email; that email does not include these estimates. Figures are generic planning estimates, not measured savings.

Ongoing newsletter email requires a separate sign-up and confirmation email before messages are sent.